{"id":27089,"date":"2024-08-24T23:57:51","date_gmt":"2024-08-24T23:57:51","guid":{"rendered":"https:\/\/allanhardingmackay.ca\/courtpainter\/?p=27089"},"modified":"2024-08-24T23:57:51","modified_gmt":"2024-08-24T23:57:51","slug":"trainwreck-delayed","status":"publish","type":"post","link":"https:\/\/allanhardingmackay.ca\/courtpainter\/?p=27089","title":{"rendered":"trainwreck&#8230;(delayed)"},"content":{"rendered":"\n<h1 class=\"wp-block-heading has-bright-red-color has-text-color has-link-color wp-elements-7e260546c878a4e4c5f11b8da1bc5e83\">Breaking News: Federal labour board orders rail workers back on the job, imposes binding arbitration<\/h1>\n\n\n\n<h2 class=\"wp-block-heading has-bright-red-color has-text-color has-link-color wp-elements-4d05278b31c4ff79d4b7b1072ce106c7\">Union will &#8216;lawfully comply&#8217; with ruling but plans to appeal, Teamsters president says<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full is-resized is-style-rounded\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"723\" src=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-rail-dispute.jpg\" alt=\"\" class=\"wp-image-27082\" style=\"width:1000px\" srcset=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-rail-dispute.jpg 1000w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-rail-dispute-300x217.jpg 300w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-rail-dispute-768x555.jpg 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/figure>\n\n\n\n<p><strong><em>Court Painter harkens back to a famous train wreck in the Paris Montparnasse terminus in October of 1885 which is presented here for dramatic effect!<\/em><\/strong><\/p>\n\n\n\n<p>OTTAWA &#8212; The future of an unprecedented Canada railway stoppage hinged on a decision expected Saturday from a federal labour board amid an ongoing, bitter contract dispute between the country&#8217;s two largest railway companies and the Teamsters union representing thousands of their workers.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized is-style-rounded\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"600\" src=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/train-wreck-3-2.jpg\" alt=\"\" class=\"wp-image-27104\" style=\"width:700px\" srcset=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/train-wreck-3-2.jpg 750w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/train-wreck-3-2-300x240.jpg 300w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/figure>\n\n\n\n<p>Teamsters, Canadian National and Canadian Pacific Kansas City were all waiting on a decision after a &#8220;marathon nine-hour hearing&#8221; before the Canada Industrial Relations Board, the union said.<\/p>\n\n\n\n<p>&#8220;The union will lawfully abide by any decision from the CIRB, and is prepared to file challenges in Federal Court if necessary,&#8221; the union said in a statement issued after Friday&#8217;s hearing.<\/p>\n\n\n\n<p>Freight shipments and some major commuter lines across Canada came to a standstill on Thursday when CN and CPKC locked out workers after months of increasingly acrimonious contract talks failed to yield a deal. It marked the first time there were simultaneous work stoppages at the railways.                          <strong><em>Source :Canadian Press August 24\/24<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized is-style-rounded\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"600\" src=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/train-wreck-2-1.jpg\" alt=\"\" class=\"wp-image-27098\" style=\"width:700px\" srcset=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/train-wreck-2-1.jpg 750w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/train-wreck-2-1-300x240.jpg 300w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/figure>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<h6 class=\"wp-block-heading\" id=\"articleTitle\">&nbsp;Railway shutdown expected to cost Canada $341 million a day<\/h6>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<p>Labour dispute disrupts transport of $1-billion worth of goods a day<\/p>\n\n\n\n<p><strong><em>Source : Financial Post<\/em><\/strong><\/p>\n<\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"714\" src=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-7-Trainwreck-2.jpg\" alt=\"\" class=\"wp-image-27102\" srcset=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-7-Trainwreck-2.jpg 1000w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-7-Trainwreck-2-300x214.jpg 300w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-7-Trainwreck-2-768x548.jpg 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"714\" src=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-trainwreck-1-1.jpg\" alt=\"\" class=\"wp-image-27101\" srcset=\"https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-trainwreck-1-1.jpg 1000w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-trainwreck-1-1-300x214.jpg 300w, https:\/\/allanhardingmackay.ca\/courtpainter\/wp-content\/uploads\/2024\/08\/Court-Painter-trainwreck-1-1-768x548.jpg 768w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Breaking News: Federal labour board orders rail workers back on the job, imposes binding arbitration Union will &#8216;lawfully comply&#8217; with ruling but plans to appeal, Teamsters president says Court Painter harkens back to a famous train wreck in the Paris Montparnasse terminus in October of 1885 which is presented here for dramatic effect! OTTAWA &#8212; &hellip; <a href=\"https:\/\/allanhardingmackay.ca\/courtpainter\/?p=27089\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;trainwreck&#8230;(delayed)&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-27089","post","type-post","status-publish","format-gallery","hentry","category-images","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=\/wp\/v2\/posts\/27089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=27089"}],"version-history":[{"count":14,"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=\/wp\/v2\/posts\/27089\/revisions"}],"predecessor-version":[{"id":27112,"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=\/wp\/v2\/posts\/27089\/revisions\/27112"}],"wp:attachment":[{"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=27089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=27089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/allanhardingmackay.ca\/courtpainter\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=27089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}